Validation
Print
Deerns has a prominent position in the field of validation technology such as system qualification, commissioning, and operation procedures. Deerns offers the full spectrum of necessities, consisting of:
- Preparation of a validation master plan (VMP)
- Independent and objective installation and operation qualification studies during construction or after renovation
- Corresponding management, operation and maintenance
A proper qualification procedure during design and construction keeps the building and appropiate systems in line with the original users’ and legal requirements, and can adapt the on-going building process to the latest point of view with regard to users’ and legal requirements. By means of the qualification process any adjustments to the building process are made visible at an early stage, thus saving investment costs and project time.
A responsible building process cannot be accomplished without a design, installation and operations qualification, including the commissioning details. A building with utility systems cannot be used efficiently/effectively without the necessary managerial, operation and maintenance procedures.