De Brug Rotterdam (Head Office Unilever), The Netherlands

Source:

The office building De Brug (The Bridge) in Rotterdam was built above part of the existing Unilever Bestfood Nederland buildings on the Nassaukade. The building rests on three supports, 25 m above ground level. The total project consists, besides De Brug, of a parking block integrating offices and other functions as well. Unilever Bestfood Nederland will be housed in the building.
 

De Brug project is characterized by two great challenges. First of all, the dimensions of the building (rectangular ca.130 m x 32 m x 4 storeys) does not make it easy to achieve maximum flexibility. The layout of the building is such that modern office concepts (e.g. movable partitioning, open-plan offices, relaxation rooms, etc) are possible. On the other hand, the design of the building offers other possibilities that a standard building lacks.

The second challenge was not to disturb Unilever Bestfood Blue Band factory operation during construction. This was achieved by prefabricating the skeleton under conditioned circumstances at a works site. De Brug was mounted on top of the existing factory, which remained in operation during construction.
 

Related projects

Multifunctional Centre De Veste, Helmond, The Netherlands Multifunctional Centre De Veste,... Theatre and congress centre La Llotja, Spain Theatre and congress centre La... Dutch Central Tax Office, Apeldoorn, The Netherlands Dutch Central Tax Office, Apeldoorn,... Green Energy Building Suntech, Wuxi, China Green Energy Building Suntech, Wuxi,... De Brug Rotterdam (Head Office Unilever), The Netherlands De Brug Rotterdam (Head Office... Het Strijkijzer, The Hague, Netherlands Het Strijkijzer, The Hague, Netherlands Oosterdokseiland Amsterdam, The Netherlands Oosterdokseiland Amsterdam, The...
Client
Dura Bouw, Rotterdam
Architect
JHK Architects, Utrecht
Structural engineer
Aronsohn consulting engineers, Rotterdam
Built-up area
14.750 m2 gross floor area (offices)
11.000 m2 gross floor area (other + parking garage)
Start design
2001
Start construction
2003
Completion project
2004